Hotels
The advances achieved by Caledonian in design, manufacture and site construction make pre-engineered building techniques highly advantageous in hotel construction.
Caledonian's ability to integrate the most advanced methods of offsite construction with traditional forms, provides rapid
build times whilst ensuring space, architectural feature and brand styling are achieved.
The modular construction approach has been proven with funders, operators and a wide variety of independent certification authorities in 2, 3 and 4 star hotel construction.
Benefits include:
- Speed - advancing development projects to provide earlier occupation and revenue generation
- Certainty of cost – fixed project costs prior to construction
- Guaranteed construction programme ensuring accurate opening dates
- Upgrade and expansion can be achieved, with minimal disruption to the on-going hotel operation
Case Studies
Premier Travel Inn Manchester Airport
Hilton Hotel Luton
Joels Inn Dublin Airport
Days Inn Dublin
Tulip Inn Dublin Airport
Tulip Inn Castleford, Leeds
Tulip Inn Portsmouth
Comfort Hotel Finchley, N. London
Sleep Inn Cambridge
Thistle Hotel East Midlands Airport





