Caledonian have developed a range of lifting and installation methods.  Both bolted and welded connection can be adopted.

We have developed our own lifting frames that provide for man safe lifting with immediate edge protection for the erection workforce.

Generally modules are installed at a rate of 8 per day bringing the ability to complete 80+ bedrooms a week.