back

Project news

Tulip Inn choose Caledonian for first of UK hotels build programme


Whilst groundbreaking work was taking place on the new Tulip Inn Hotel site near Portsmouth Marina, pre-engineered units, complete with utility fixtures and fittings were, to plan, moving off the production line at Caledonian's Carlton, Newark, manufacturing centre.

The fast-track design, engineering and build, provided by Caledonian, was a primary influence in Tulip Inn choosing Caledonian for the first of several hotels to be built at key sites in the UK. The concept of pre-engineered building meant Caledonian was able to dedicate a complete fabrication and assembly line to the Tulip Inn project where build programme is strictly adhered to, undisturbed by poor weather conditions!
In the 6 months since groundwork, the development reached a stage of completion that would have taken a whole year, if undertaken by conventional build techniques.

Full story and images from the project can be seen within application studies

placeholder image
Image Caption