Residential
The benefits of pre-engineered building are increasingly being recognised within the residential build market. Caledonian fast-track building has been chosen for several notable projects where rapid build time and minimal disruption on site, was essential. Pre-engineered building will rapidly increase within the residential sector, where finite budget control, accelerated completion and environmental considerations are critical factors.
Benefits include:
- Accelerated building programme
- Certainty of cost – fixed project costs prior to construction
- Guaranteed construction programme ensuring accurate completion dates
- Caledonian design teams work with the client at an early stage to ensure the benefits of off-site construction are achieved on each project
- Accelerated programme achieved using proven modern construction methods
Case Studies
Winton School Islington, North London
The Paragon Project Brentford, West London
Royal Northern College of Music Manchester





